Saturday, March 7, 2009

Progress



Things are happening at our lot.  I met with Joe (builder) yesterday and he explained everything:
1.  We have electricity
2.  We have new stakes and string outlining the house
3.  We have chalk outlining the digging lines (they are 3 feet outside the house strings)
4.  We have markings for the height of the basement floor (almost 3 feet above the flood plain)
5.  We have markings for the height of the floor in the house which is about 1 foot above street level on the north side of the lot, and almost 4 feet above street level on the south side.
6.  Our builder posted his sign so sub-contractors can find the lot